Lower Addition Hallway

With the three lower addition rooms wired and near completion the lower addition hallway was gutted. This area has need some attention for a number of years and finally it has come to that point. The wood paneling was run down and the radiator basboards were still in use because rerouting needed to be done through the walls. The hallway has been rewired and will be plywooded and drywalled like every other room. Also a smoke detector and pull handle will be installed in addition to emergency lighting to comply with current codes.